Party Wall Advice - Building an Extension Wall Astride the Boundary

Image
It may seem counter-intuitive that the Party Wall Act should allow a building owner to construct a wall for his own use (e.g. in order to enclose on his ground floor extension) partly on his neighbour's land. If you are an adjoining owner reading this, you my be pleased to hear that the Act only allows it in only very specific situations and then only with certain caveats. It is worth noting that even where the building owner does not have the right to build a wall straddling the boundary line, there is nothing to stop him from sending the adjoining owner a notice requesting permission to build such a wall. Where the right does not exist, the adjoining owner need not even reply as there is deemed dissent. So when, you may ask, does the building owner have the right to construct such a wall (following notice) even with the dissent of the adjoining owner? The answer is - 'where there was a pre-existing wall in that position'. For example, there is an existing garde...

Party Wall Advice - Notices

So what are the rights of an adjoining owner who has just received a Notice with regards proposed works to be undertaken by his neighbour ('the building owner)'? Can he simply refuse to allow the works to go ahead? The answer to that is not as straightforward as it may first appear. Listed below are various possibilities: Q 1) The building owner has served notice to build an extension with the wall to be built wholly on the building owner's land but has stated in his notice that the foundations will straddle the boundary line. The adjoining owner is concerned about damage to the lawn of his back garden should the proposed wall be built. A 1) The adjoining owner cannot prevent the wall being built wholly in the building owner's land, however he can usually insist that the foundations do not straddle the boundary line but rather, are constructed as 'eccentric' ones wholly on the land of the building owner. Only where the building owner can show ...

Making Good All Damage

Image
Ground Floor Extension - Repairing Damage to a Party Wall Party Wall Connects Extension with House 'Damage' can take a number of forms and the following is just one slightly non-obvious example which involve a ground floor rear extension. The adjoining owner had already built a rear extension partly utilizing an existing party wall. which had previously served as an enclosing wall of a rear garden lavatory. When the lavatory was removed all the walls were removed except the party section. The adjoining owner (as per the picture) had built his extension flank wall enclosing on this party wall and connected a new wall to it which formed the remainder of the flank wall. When you look closely at the party wall you see a vertical line of yellow insulation showing in gaps along the rough brickwork. These gaps in the brickwork no doubt occurred when the rear lavatory walls were removed on both sides.  . The building owner was intending to build his new extension in exact...

Schedule of Condition - Loft Space

Image
Most surveyors dread them, those long ago closed-down projects that rise up during the busy work week with a vengeance. Usually, it is in the form of an email from an adjoining owner indignantly claiming damages caused as a result of works to the party wall. Chimney breast supported on gallows brackets Generally speaking, the smaller the amount of alleged reported damage the more potentially troublesome this can be for the surveyor whose job it is to trawl through his schedule of conditions and pictures in the valiant hope that he has sufficient records on which to entertain or reject the claim. With larger claims for damages it is much more likely the surveyor has sufficient records to show that the badly cracked wall reported was either already noted at the time the schedule was undertaken or was not and is therefore a new development resulting from the works potentially.  But where the surveyor neglects to bring along a ladder to the schedule of condition in ...